Balfour Beatty A120 Stansted to Braintree

Balfour Beatty Major Projects contacted us to help with the design and construction of a site compound to accommodate up to 300 people who would be responsible for the construction of the new A120 road from Stansted to Braintree.   From the initial meeting it was clear that timing of the works was crucial since… [Read Full Article]

The Knowledge Gateway at the University of Essex

Jacksons Civils Having won the main drainage works in December 2010 we have undertaken to complete works on both foul and surface water deep drainage systems. The project is a design and build project under the main contractor. The works include all roads and gulley work and drainage works ranging from 1.5m to 4.5m deep…. [Read Full Article]

Balfour Beatty A3 Hindhead

Balfour Beatty used Owls Hall Environmental as their trusted framework partner to design, install and manage Installation of site compound and resolution of issues at Robinia Care Home. OHEL completed a survey of the area and worked closely with Balfour Beatty and the Robinia Care Home, proposing the installation of a new, high capacity, twin… [Read Full Article]

Balfour Beatty Civil Engineering – A421 M1 Junction 13 to Bedford

Owls Hall Environmental assisted with and provided the design and installation of the onsite reticulation drainage systems to the Balfour Beatty’s main and satellite compounds which accommodated 150 staff, up to 450 works personnel and 100 caravans. The works involved installation of separators, pump stations, treatment plant and temporary storage, UV and alarm systems, drainage… [Read Full Article]

Design and installation of a pumped sewerage system

Chelmsford Borough Council awarded Owls Hall Environmental Limited contract for the design and installation of a pumped sewerage system to connect Hylands House and its associated buildings and facilities to the public and foul sewer. The system design and installation included all materials and workmanship shall be in accordance with the Sewers for Adoption 6th… [Read Full Article]

Skanska Balfour Beatty Joint venture-M25 DBFO Project

Owls Hall Environmental were awarded and worked on all three section of the M25 Project and the refurbishment of the Hatfield Tunnel which is located on the A1M. The works involved the design and construction of all the three site compounds, which included electric works, underground pipe works, excavation works and deep drainage works. We… [Read Full Article]

Design Build and maintain – Vehicle Wash-down Facility

The scope of the project was to improve the existing Wash down system at Hosea’s Headway at the MOD and build a new wash down facility at X5 facility. It was part of the Sands Fleet Life Extension of Project 767. Extensive wash down of defence vehicles is required to maintain vehicle hygiene and prevent… [Read Full Article]

Hitchin Alliance: (Network Rail – Hochtief UK Partnership)

OHEL were awarded the drainage works as part of the Hitchin Grade Separation Project. The scheme involved the construction of the new elevated route via imported fill embankments and an elevated rail flyover extending over 800m and comprising steel girders and concrete deck. The project was managed through the Alliance Integrated Project Organisation known as… [Read Full Article]