Balfour Beatty used Owls Hall Environmental as their trusted framework partner to design, install and manage Installation of site compound and resolution of issues at Robinia Care Home.
OHEL completed a survey of the area and worked closely with Balfour Beatty and the Robinia Care Home, proposing the installation of a new, high capacity, twin pumping station. The system included 24 hour backup capacity in case of power failure.
OHEL used their specialist equipment to ‘fusion weld’ pipes passing under the A3 carriageway from the pumping station to the previous existing discharge point. This ensured they would never rupture, causing future problems to the carriageway construction.
Ruth Kelly—Secretary of State for Transport
Throughout the works it was crucial that the care home had continued access to the mains sewer so that it could continue to operate as normal.