Balfour Beatty Civil Engineering – A421 M1 Junction 13 to Bedford

Owls Hall Environmental assisted with and provided the design and installation of the onsite reticulation drainage systems to the Balfour Beatty’s main and satellite compounds which accommodated 150 staff, up to 450 works personnel and 100 caravans.

M1 Junction 8 projectThe works involved installation of separators, pump stations, treatment plant and temporary storage, UV and alarm systems, drainage and ducting. We also managed the interface with the Environment Agency and Anglian Water which included the obtaining of all licenses for connections and discharges.

 

“We have found both their management staff and site staff to be both professional and proactive… I would recommend them for future works”

— Brandon Cromhout Team Leader, A421 Earthworks and Dr ainage

 

 

The programme was challenging in respect of timescales and had to be carried out during a very wet winter. Close co-operation and interface with the buildings and earthworks contractor on the original design had to be developed to incorporate concrete and foam mix plants.

site sewage treatment installation                                site compound sewage installation